Simulate your own photovoltaic park!

County:


Peak Power (MWp):


Electricity Price (€):

1 Green Certificate price (€)::

Green Certificate Number:

Technical & economic resoults

Area of land (hectares):
Global irradiation (kWh/m²/y):
Annual production of electricity (MWh/y):
Energy sale (€/y):
Green certificates sale (€/y):

Total inputs (€/y):

Area of land required for a photovoltaic park of 1 MWp is about 2,5 hectares. We recommend you a plane with a slope of not less than 5%, easily accessible and that has a medium-voltage line nearby. The simulator is calibrated for the use of panels fixed system, crystalline silicon and with optimally inclined surface.

REQUEST AN APPOINTMENT FOR YOUR BUSINESS PLAN

WARNINGS REGARDING THE USAGE OF THE SIMULATOR

1 – IRRADIATION
We used a medium irradiation value of the territory that has an optimum tilt of the photovoltaic panel. Irradiation represents the medium quantity of energy that comes from solar radiations incidental to the horizontal plane. It is measured in KW/m2/y.

2- NOMINAL POWER or POWER SYSTEM PEAK
This is the power that the constructor of the panels declares as being power produced in “Standard Testing Conditions”, in other words, an irradiation of 1000W/square meter and a temperature of the modules of 250C. It is measured in kWp (1.000 kWp = 1 MWp).

3 – AREA OF LAND REQUIRED
The calculation was performed taking into account a limit corridor, the surveillance of spaces and the electric cabin, internal corridors to avoid shading as well as those for maintenance.

4 – ANNUAL ELECTRICITY PRODUCTION or FINAL YIELD
This information comes as a result of the calculation made using data from the European Commission and the ANM (National Meteorological Administration). Subsequent calculations are based on some prudential assumptions that have a statistic character. However, this is a preliminary estimation and is not detailed.

5 – PRODUCED ENERGY SALE AND GREEN CERTIFICATES
The economical accounts are made according to law 220/2008.

6 – LIABILITY
ENERGY STREET assumes no responsibility regarding the information offered by the simulator. This information has an informational and generic character and does not constitute a professional advice.